Project Description

MJ Hughes first completed the owner’s 30% design then we replaced failing slide gates and added keyed rip rap slope protection along the outfall of the dam.

MJ Hughes also provided design and installation of Waterman slide gates.

Project Team and Stats:

Owner: US Fish and Wildlife
Location: Alturas, California
Start Date: December 2010
Completion Date: January 2011