Klickitat Bridge

MJ Hughes Construction | Portfolio | Klickitat Bridge
Klickitat Bridge 2017-04-25T10:47:13+00:00

Project Description

This project required building a detour roadway with traffic control devices; major earthwork and the temporary diversion of a stream; removal of an old existing bridge; and replaceing it with a concrete cast in place structure. The challenges for this work consisted of a very remote location to suppliers; very tight work area; weather extremes; and a water window for completion.

Project Team and Stats

  • Location: Klickitat, WA
  • Start Date: May 2016
  • Completion Date: Devember 2016
  • Owner: Washington State Department of Transportation