Project Description

This project required building a detour roadway with traffic control devices, major earthwork, and the temporary diversion of a stream; removal of an old existing bridge; and replacing it with a concrete cast-in-place structure. The challenges for this work consisted of a very remote location to suppliers; a very tight work area; weather extremes; and a water window for completion.

Project Team and Stats

  • Location: Klickitat, WA
  • Start Date: May 2016
  • Completion Date: Devember 2016
  • Owner: Washington State Department of Transportation