Project Description

Milepost .64 to 1.20

This project repaired approximately 1/2 mile of SR 2. The scope involved removing spalled concrete, abrasive blasting, rebar repairs, watertight formwork, pressure grouting voids/repair areas, applying carbon fiber reinforcement, and applying pigmented sealer. Most of the work was constructed at night to minimize disruption to the approximately 250,000 vehicles per day.

Project Team and Stats:

Owner: Washington State Department of Transportation
Location: Everett, Washington
Start Date: April 2011
Completion Date: September 2011

Project Gallery