This contract replaced two failing bridges. The largest of these is the Blackwell Road Railroad Overcrossing site.
Blackwell Road Railroad Bridges
This contract replaced two failing bridges. The largest of these is the Blackwell Road Railroad Overcrossing site. The project involved 62,000 cubic yards of embankment, a precast box culvert with stream rock and fish habitat placed within, a two span bridge and 41,000 square feet of Mechanically Stabilized Earth Walls.