This project removed an old wood stop log spillway system and upgraded it to hydraulically controlled Obermeyer sluice gates. Major hydro-demo on the sloped spillway system was required to provide channels for the control lines, both horizontal and vertical. We had to build extensive heavy-duty scaffolding to access the demo and control installation areas. This scaffolding provided worker access, the hydro-demo machine, and a landing spot for copious amounts of concrete deposits for removal. An added scope to the project was the construction of the control building and equipment. A major flooding event occurred during this project’s final stages, which not only shut it down for several months but also caused extensive damage to the scaffolding.
Oregon City, OR
July 2016
Weather Delay
Portland General Electric
2013