This City of Portland, Oregon project involved a two-lane tunnel 250 feet long and another 500 feet long. Each tunnel received a new illumination system; hydro demolition removal of delaminated and deteriorated concrete; installation of approximately 120 cubic yards of new shotcrete lining; drainage improvements behind the new lining and the existing concrete. This drainage included 3-inch diameter drain holes drilled 10 feet deep into the hillside. In total, 20 cubic yards of voids were pressure grouted.
Independence, Oregon
September 2010
March 2011
Oregon Department of Transportation
2013