This project consists of replacing a 90′ long railroad bridge The work involves driving steel h-pile, welding bracing, caps, installing new concrete bridge components, and various concrete repairs. Other work includes installing new culverts, placing rip rap, grading and restoring the site vegetation.
Caldwell, KS
July 2014
September 2014
Union Pacific Railroad
2013