This project replaces an existing 452′ creosote timber bridge with a 448′ PCB concrete bridge. The work involves driving steel h-pile, welding bracing, caps, and installing new concrete bridge components. Other work includes installing new culverts, placing rip rap, grading, and restoring the site vegetation.
Luling, Texas
June 2014
July 2014
Union Pacific Railroad
2013