2006 was especially harsh on the North East side of Mount Hood, damaging several parts of HWY 35 and washing out this bridge which MJ Hughes was hired by Anderson Environmental to replace. The four abutments were set on pipe piles drilled in very difficult cobble and boulder conditions. Access to place the girders was another challenge overcome by our team.
Parkdale, Oregon
July 2010
March 2011
Federal Highway
2013