Project involved constructing a temporary work bridge to span over existing electrical equipment outside of the powerhouse to perform window replacements. The existing windows in the powerhouse are being replaced with glass block. The project involves lead abatement and disposal work to remove the existing windows. Work is being coordinated with other construction activities to coincide with other power outages
Palisades Power Plant, Idaho
March 2015
October 2015
Bureau of Reclamation – Boise, Idaho Office
2013