This project involved refurbishing concrete stoplogs for Chelan PUD.
Rocky Reach Dam Concrete Stoplog Refurbishment
This project involved refurbishing concrete stoplogs for Chelan PUD. Work consisted of removing and replacing the rubber seals around the perimeter of the concrete stoplogs; removing existing bearing blocks; installing new guide blocks; chipping out existing deteriorated concrete; replacing concrete on 6 of the stoplogs; and remove and install new leveling blocks.