Expansion and modernization of roughly 1,350 feet of operational Post-Panamax berth area at Port of Portlands Terminal 6. The project includes Excavation, Demolition, Stone Columns, Jet Grout Columns, Extensive changes to the dock stormwater collection systems, Installing a new reinforced concrete crane rail beam adjacent to the existing waterside crane rail, and new electrical infrastructure for the cranes.
Portland, Oregon
April 2011
November 2011
Port of Portland
2013