Project Description

This was MJ Hughes first bridge construction project. The bridge is founded upon drilled shafts with concrete crossbeams and spans 150 feet in a single span. The project also involved blasting and solid rock excavation, mechanically stabilized earth walls with architectural facing which MJ Hughes performed in house and removal of the old steel truss bridge. MJ Hughes self performed the drilled shafts, concrete work, steel erection , excavation and bridge removal work.

Project Team and Stats

Owner: Jackson County
Location: Prospect, Oregon
Start Date: March 2004
Completion Date: October 2004