Project Description
This project repairs the concrete on a section of the existing draft tube deck on the Rocky Reach Dam for Chelan County Public Utilities District. A microsilica concrete overlay was poured over the draft tube deck. Work involves installing wet containment measures on a section of the Rocky Reach Dam to prep for hydro blasting the Draft Tube Deck. Hydroblasting and hand chipping will be performed on the deck to remove damaged concrete. A microsilica-modified concrete overlay will be placed on the deck. Work also involves some new joint sealant, metalwork, and new paving.
Project Team and Stats:
Owner: Chelan County PUD
Location: Wenatchee, WA
Start Date: October 2013
Completion Date: October 2013